Vegetation clearing, debris removal, grading and erosion correction that keep a detention pond's emergency spillway clear and functional.

In Seguin, the first part of a detention pond to quit working is usually the spillway channel itself, not the inlet or the pond face. Pecan leaf litter and seed pods wash down from the overhanging trees along the Guadalupe River bottomland lots, pack into the low point of the channel, and the next hard rain finds that blockage before anyone else does.
This stretch of river bottomland holds moisture, which is good for pecan trees and bad for a spillway you need to drain fast. We see slow drawdown after storms, forebays silted in from Guadalupe River runoff, and volunteer pecan and hackberry saplings rooted into embankments at properties off Starcke Park and Mill Creek. Older Navarro-area developments built before current grading standards tend to show bare, eroding slopes where grass never established, which widens every time it rains.
For the property manager, HOA board or GC closing out a site, working with us on this scope means one site walk, a clear estimate, and a crew that clears vegetation, pulls debris, regrades the channel and corrects erosion to the lines your engineer's plan calls for. We are locally owned, licensed and insured, and we schedule most on-site estimates within 48 hours of your call.
We're a local, family-built company that treats your Seguin property like our own, tidy crews, clear pricing, and emergency spillway maintenance that holds up to Guadalupe County conditions. Available as a one-time project or part of an ongoing plan.
We meet you at the basin, usually within 48 hours of your call, and walk the spillway channel, the embankment and the outlet together. You point out the slow spots or the last storm's damage, we take measurements and photos for our own scope, and you get a written, no-obligation estimate before anything is scheduled. No cost to have us out.
Most of the ponds we see around Starcke Park and Mill Creek need spillway clearing once a year at minimum, more often if the property backs up to river bottomland or has pecan trees seeding into the embankment. A hard spring storm or a summer of neglect can also trigger an out-of-cycle call when the spillway stops draining the way it should.
Not in any way that lasts. Spillway and embankment work happens at the edge of the property, away from units, leasing offices and parking rows, and we do not block drive aisles or resident access. If a gate or easement needs to stay open for emergency vehicles during the work, we plan around that before we start.
River bottomland soil here holds water and silts in fast, so forebays and spillway channels fill with sediment sooner than you would expect. Pecan trees along the Guadalupe seed themselves onto embankments and spillway banks, and a few seasons of that turns into root systems that crack the channel and slow drawdown after every rain.
The biggest factors are how much vegetation and silt have built up, whether volunteer trees have to come out with their root balls, and how much grading or erosion correction the channel needs to carry water the way it was designed to. A spillway that gets walked annually costs a lot less to fix than one that has been ignored for several seasons.
Free, no-pressure estimate from a local crew. Call (737) 404-9343 or request a quote online.