Detention and retention pond construction that controls stormwater and meets site requirements.

Walk the low end of most detention basins in Seguin and you will find the same thing: a forebay half-filled with silt, a slope growing volunteer pecan saplings nobody planted, and an outlet pipe doing less work than it should. That is what years of Guadalupe River bottomland runoff does to a pond that was graded right the first time but never touched again.
Seguin's rich river-bottom soil carries a lot of fine sediment, and when storms move through Guadalupe County that sediment settles out fast once it hits slower water. Add pecan-shaded lots and older subdivisions around Mill Creek, Navarro Ranch, and Geronimo, and you get basins with bare, eroding slopes, embankments cut by tree roots, and drawdown times that have crept from hours into days. None of that shows up until someone finally measures it.
Working with us on this scope starts with a walk of the actual basin, not a conversation about what one should look like. We tell you what we find in the forebay, on the slopes, and at the outlet structure, then scope the excavation, grading, erosion control, and riprap or liner work the site calls for. Estimates are free and usually scheduled within 48 hours, and we work the job to your site plan or alongside your property engineer.
We're a local, family-built company that treats your Seguin property like our own, tidy crews, clear pricing, and detention ponds that holds up to Guadalupe County conditions. Available as a one-time project or part of an ongoing plan.
A detention pond temporarily holds stormwater runoff and releases it slowly, so a developed site doesn't flood downstream neighbors or overwhelm storm drains. Most Central Texas commercial sites, subdivisions and larger developments are required to have detention as part of their drainage permit.
A detention pond drains down to empty between storms and is dry most of the time, while a retention pond holds a permanent pool of water. We build and maintain both, choosing the right one based on your site's soils, drainage requirements and available space.
We walk the basin with you, from the inlet down to the outfall, and look at drawdown time, sediment load in the forebay, and the condition of the slopes. The estimate is free with no obligation, and we usually get out to Mill Creek, Navarro Ranch, or Geronimo properties within 48 hours of your call. You will get a clear scope before anything is scheduled.
It depends on the basin's age and how much sediment the drainage area feeds it, but river-bottom pecan lots along the Guadalupe tend to silt in faster than upland sites. Many boards find they need excavation, regrading, or outlet clearing every few years, sometimes sooner after a heavy flood season. A site walk tells you where your basin actually stands.
We plan access and staging around your property's traffic, whether that is an apartment parking lot, a retail center, or an HOA common area. Most detention and retention work happens at the low point of the site, away from units and storefronts, and we coordinate timing with your manager so residents and customers are not blocked in.
Guadalupe River bottomland holds water and silt differently than caliche or rocky Hill Country ground, so basins here tend to show slow drawdown and a heavier forebay buildup than sites west of town. Pecan-shaded lots also grow volunteer saplings on embankments fast, which we remove and stabilize before they undermine a slope or outlet structure.
The amount of excavation and how deep the sediment has built up drive most of the cost, along with how much slope stabilization, riprap, or liner work the embankments need. Access matters too. A basin tucked behind a building or across soft bottomland ground takes longer to reach than one with a clear approach from the road.
Free, no-pressure estimate from a local crew. Call (737) 404-9343 or request a quote online.