Repair and stabilization of eroded pond slopes, embankments and channels using grading, soil stabilization, vegetation or riprap.

Detention ponds built across Schertz over the last several years are starting to show the kind of wear that only shows up after a few real rainy seasons. We repair eroded slopes, embankments and channels for the property managers, HOA boards and general contractors who are responsible for keeping those basins doing their job, from The Crossvine to Ashley Park to Forest Ridge.
The blackland clay under most of this corridor swells when it is wet and cracks hard when it dries, and that constant movement works on a pond's slopes year after year. We see it most often as bare, slumping embankments where the original grass never took, a forebay silted in enough to slow drawdown after a storm, volunteer trees rooting into the dam where nobody wants them, or an outlet structure partly blocked by sediment washed down from an upslope cul-de-sac. In newer sections along FM 78 and I-35, a lot of this traces back to grading and seeding that was done once at construction and never revisited.
Working with us on this looks like a straightforward site walk first, where we look at the whole system, not just the spot someone noticed. We tell you plainly what is eroding, why, and what it will take to fix it, whether that is regrading a slope, stabilizing soil before replanting, repairing a channel, or placing riprap at an outfall. If the pond is tied to an engineer's design, we do the repair to that plan rather than guessing at it. You get a clear scope and a crew that shows up and does the work.
We're a local, family-built company that treats your Schertz property like our own, tidy crews, clear pricing, and detention pond erosion repair that holds up to Guadalupe County conditions. Available as a one-time project or part of an ongoing plan.
We walk the basin with whoever manages the property, usually the association manager, board member or GC closing out the site, and look at the slopes, the forebay, the outlet structure and any channel leading to it. We measure the eroded areas, check how water is actually moving versus how it was designed to move, and give you a written scope and price. Estimates are free and we typically get out within 48 hours of your call.
It depends on the pond's age and how it was built, but in newer Schertz developments along FM 78 and I-35 we often see the first real erosion show up within a few years of construction, once the blackland clay has gone through several wet and dry cycles. Ponds with bare slopes or thin topsoil from the original grading tend to need attention sooner than ones that were seeded and stabilized well at handover.
We stage equipment and materials at the pond itself whenever the access allows it, not in resident or tenant parking, and we coordinate timing with the property manager or HOA board ahead of the work. Most detention ponds in communities like The Crossvine or Ashley Park sit apart from the main parking and living areas, so the work rarely interferes with day to day traffic once we are set up.
The blackland clay here swells when it is wet and shrinks and cracks when it dries, which opens up slopes and loosens any vegetation that is not well rooted. Combined with the heavy, fast rainfall typical of this corridor, that movement is what turns a small rill on an embankment into a real channel if it sits untreated for a season or two.
The main factors are how much slope or channel needs regrading, whether the soil needs stabilization work before anything is seeded or matted, and whether riprap is needed at the outfall or inlet. Access also matters. A pond with a clear path for equipment costs less to work on than one boxed in by fencing, retaining walls or mature landscaping that has to be protected.
Free, no-pressure estimate from a local crew. Call (737) 404-9343 or request a quote online.